Projects |
|
HARMONIZATION OF GRISIGNANO TOLL STATION CONNECTIONS
Description:
The project consisted in the creation of a slipknot access road between the toll barrier and the S.R. 11, which intersects the Main Road with an underpass thus eliminating the existing ground level crossings..
The main operations consisted in the construction in a.c. of the S.R. 11 underpass, the creation of junction and connecting lanes, the creation of a new car park next to the toll barrier, as well as the rainwater lifting apparatus of the underpass.
Technical data:
- Territorial area: Municipial Districts of Grisignano (VI) and Mestrino (PD);
- Rebuilding of the S.R. 11 for a stretch of 650 m with a section of 1 lane for each direction;
- Creation of a new junction on offset levels for the entrance onto the S.R. 11.
State of work:
COMPLETED
Open to traffic:
AUGUST 2003.
|